They are still testing spotted this 30 seconds ago
It's a fundamental characteristic of an operational TTC line...I've been seeing broken windows on several stops for months now. Glad it's finally getting attention.
![]()
Several panels at Finch West LRT stations damaged, work to fix other deficiencies continues
As Finch West LRT testing and commissioning continue without a projected opening date for the line, several glass panels at station platforms have been damaged for months while crews are addressing other deficiencies. Nick Westoll reports.toronto.citynews.ca
The area under the CP bridge seems untouched for monthsYes the section infront of the MPP's office there, between weston and signet/arrow is the only area that still hasn't been constructed (roadway, the guideway is long done). I suspect there are issues with CP, otherwise I can't imagine why they haven't done anything yet.
So trains (streetcars) do get stuck behind red lights...They are still testing spotted this 30 seconds ago View attachment 665537
So trains (streetcars) do get stuck behind red lights...
They are still testing spotted this 30 seconds ago View attachment 665537
its time to let it go........I know it's a small thing but it bothers me that they didn't stick with red and white for the LRTs. It's politics, Metrolinx wanting to show off that they funded this.
If they are "testing" or "operating as if in revenue service", then the traffic signals on Line 6 (and Line 5) should be turned on for transit priority NOW.Not sure signal priority is turned on yet since the line isn't in operation.
I know it's a small thing but it bothers me that they didn't stick with red and white for the LRTs. It's politics, Metrolinx wanting to show off that they funded this.