Greenspace
Senior Member
Been told 104 Street intersection should re-open north/south around beginning of August.
And they’ll be switching to closing 105st for intersection construction when 104st opensBeen told 104 Street intersection should re-open north/south around beginning of August.
no photos, but the crews are prioritizing the curbs and sidewalks next to DOSC and Birdog, looks they will be the first things re-opened on 104th.
I assume 'they' refers to the sidewalks?Maybe I'm misunderstanding your post, but did DOSC and Birdog really shut down temporarily during the LRT construction?
Their entrances were completely destroyed, but the restaurants stayed open.Maybe I'm misunderstanding your post, but did DOSC and Birdog really shut down temporarily during the LRT construction?
I don't think the signalling will be fixed until next year. You could fix it with right turn only except for 109th and 116th.I drove on 104 Ave from 101 St to 121 St late this morning on my way to the west end. Big mistake! I could swear to God I was stopped at a red light for 4 minutes at every block along that stretch. I'll continue to avoid 104 Ave until they fix these traffic lights. Completely unacceptable.