realkevbo
New Member
I can't stop thinking about how these track slabs should have been prefabricated offsite and then just dropped into place.
Not possible, the tolerances are too tight and the ride quality would be terrible. If it was high floor they could have used precast tiesI can't stop thinking about how these track slabs should have been prefabricated offsite and then just dropped into place.