Is there a more recent plan? This map says 2023 but it shows the relief line route which was cancelled in 2019.
Is there a more recent plan? This map says 2023 but it shows the relief line route which was cancelled in 2019.
Wonder if they'll removed the grey supports and let it hang from its cables as soon as the final arch piece is in. And I guess they could remove the 'false bridge' below it at that point too?
No seagull though.Looks pretty close to the render:
View attachment 727249
I asked that same QQ…They never built it as a bridge and will have to dig out the Eastern portion. Brilliant Metrolinx techniques at work as per usual…Watching East Harbour station pictures I wonder. Isn't Broadview ave going under the station? I see it on N 4 rails but S side only shows the orange plastic cover. Is that stretch built as bridge or there will be more rail closures coming?
Presumably there was a reason to stage it this way; it's in the plans. Perhaps there's a reason that it makes more sense to build the southern bridge as part of the East Harbour GO station - I certainly don't see the same kind of foundations for the GO stations as I see for the Ontario Line station.I asked that same QQ…They never built it as a bridge and will have to dig out the Eastern portion. Brilliant Metrolinx techniques at work as per usual…
Or perhaps it’s another example and reason why p3 projects don’t work and cost 3x more than they ought too. I’ve watched work be done, undone, redone, and then undone again over and over and then we wonder how we’re at $1BN+ a km when it ought to cost $350MM a kmPresumably there was a reason to stage it this way; it's in the plans. Perhaps there's a reason that it makes more sense to build the southern bridge as part of the East Harbour GO station - I certainly don't see the same kind of foundations for the GO stations as I see for the Ontario Line station.