Seems like they're very ahead of schedule. The next phase where they will be installing scaffolding over the entire bridge in order to do paint touch-ups and lighting installation was planned for August.

07 2.jpg

08.jpeg

09.jpeg
 
Sorry but I think this is not the Don Bridge. Those look like precast concrete segments after they've been epoxy'd together not steel sections.

You are correct, my mistake. I forgot he was in Miami. Still hilarious though.

*(Post above Edited: Not Ontario Line 3 bridge as I had originally thought).
1774906191041.png

This is the bridge the photo above is from, below.

DJI_20250808090602_0021_V_ENRready.jpg

Photo by Nicole Bryant, the Corradino Group/Courtesy FDOT
 
I've seen you credited on the news (forget which one) a couple of times recently. Which I'm sure you know about.
I know about some of my Sky Tower shots making a CityNews story and that one BMO bleachers shot that went viral. Biggest ones that picked that up were BMO one were BlogTO and Now.
 
Are there plans to connect the West Don Lands area to the East Harbour station for pedestrians and cyclists ?
Originally a bridge was shown in Metrolinx's work, but they dodge the question these days, saying that the bridge would not be part of the same contract of whichever small bit they are discussing at any point in time.
 

Back
Top