If they finish all the segments by September, would they be able to convert the roadways into their final configuration by the end of this construction season, even if they still have to lay the rails and catenary on the guideway afterwards?
They aren’t finishing that stretch of roadworks this year, as they have to do the other side still on almost all of meadowlark road - AHD.
 

They're getting a move on with the stairs at Misericordia:
1753896347578.png
 
Last edited:
Rotem LRV #2027 has been delivered to Gerry Wright, or at least half of it.
There was a second truck by the looks of it so the other half of the car might have already been off loaded and moved inside.
No good photos as I was taking drive by shots from the train.
 
Last edited:
That's an older picture from when it was still at Hyundai's plant. I could be wrong but I think it's actually the first picture of it that was released.
I think that is close to a year old. I believe there's another, similar view floating around.
The car that was displayed at the trade show that popped in a a few videos linked too on here lacked fleet numbers, so presumably that's our second car. #2027 might have well been in transport when they had that trade show.
 
It’s not the most current picture, but I thought it would be of interest.
For sure, it's a great picture to share! I just wanted to give some context for people who weren't familiar with it; sorry if it seemed passive aggressive because that wasn't my intention :)
 