Valley Line West has many critical intersections, perhaps more than the SE segment. I hope for two completed goals:

(1) Track crossings at 124 Street and other major intersections done.
(2) Track beds completed for much of the LRT.
 
IMG_0109.jpeg
IMG_0108.jpeg
 
I haven't noticed any mention of "Art" pieces being installed on the West leg stations as compared to the SE leg stations......?
 
There is art on the ramps to the flyover.
For sure there is. I was referring to how on the SE Leg - there was art commissioned for each stop, ie - the "Dancing Deer" over at Muttart etc. However, no art commissioning for the West leg?
 
For sure there is. I was referring to how on the SE Leg - there was art commissioned for each stop, ie - the "Dancing Deer" over at Muttart etc. However, no art commissioning for the West leg?
It’s still under the arts council responsibility so I assume it’s the same
 
LRV update:

The first Valley Line West Light Rail Vehicle (LRV) is scheduled to arrive in Edmonton by summer 2025, following months of rigorous testing in South Korea. This includes low-speed dynamic testing, systems validation and a final inspection.

Additional vehicles in the 46-LRV fleet are in various stages of assembly and testing.
 