June 10th:

tempImagefFP8on.jpg
 
The big reveal at 21 Lower Jarvis St., east side, 2025.
Okay, just the fence gets its own address.
I wonder if Metrolinx dated any of the Eglinton LTR concrete work during construction.

The square pattern in the concrete, and the date marker, matches what was present on the old abutment from the 1920's. I had despaired what would happen to those attributes in the new construction

Kudos to ML for noting, and perpetuating, that detail.

- Paul
 
The square pattern in the concrete, and the date marker, matches what was present on the old abutment from the 1920's. I had despaired what would happen to those attributes in the new construction

Kudos to ML for noting, and perpetuating, that detail.

- Paul

So there will be three dates here. 1927 for the original bridge, 2009 for work the City did, and now 2025.

1752868716963.png
 
Sorry what is all of this work for? More capacity on the LSW - LSE lines? & Bigger platforms at Union station?
 
Sorry what is all of this work for? More capacity on the LSW - LSE lines? & Bigger platforms at Union station?

More capacity by adding a Track 7 and 8 here on the south side. There should be some documents still on Metrolinx's website if you look up Union Station Rail Corridor East Project. At one point they were going to extend Track 1 all the way past Cherry but it ran into some NIMBY opposition from St Lawrence residence.
 