nstuch
Active Member
interesting to see it from this perspective, so they're making the railway corridor (and the dark, dank, pedestrian walkways) about 50% longer than they are currently?
Longer, yes.interesting to see it from this perspective, so they're making the railway corridor (and the dark, dank, pedestrian walkways) about 50% longer than they are currently?
The Jarvis bridge is being widened by 9.86m, from the existing 30.7m. The Sherbourne bridge is being widened by 9.9m, from the existing 26.5m.interesting to see it from this perspective, so they're making the railway corridor (and the dark, dank, pedestrian walkways) about 50% longer than they are currently?
Assuming all the cable has been removed now.
View attachment 647409
View attachment 647413
Sherbourne Bridge lift in place Oct 4th & 5th weekend
View attachment 647411
View attachment 647410
Jarvis bridge lift Oct 11th & 12th Long weekend
View attachment 647412
It means they have a schedule to share! Bonus pointsDoes this mean it's two weeks behind schedule?
They have 2.5 towers left.
One at parliament and 1.5 at sherbourne
I guess they cut the bolts off and lifted the tower down in sections last night.
Way ahead of schedule now.
View attachment 648067
View attachment 648068
They are all gone except for a few feet of the bases. Rode the GO today and there are just a bunch of piles of scrap now and not a lot else.Pretty sure they’re all gone now!
WOW. What a documentation.