And Line 2 was down for signal issues for 2+ hours Broadview to Vic Park. Judging by the way my train is crawling, there are still some gremlins in the works
Better to have a design in place for the Western Yard encase funds show up down the road from all levels than starting design work when funding announce It will save years getting the yard built once funding is found with construction starting sooner than later.A somewhat less noticed report on today's TTC agenda was for contracts awarded with a value greater than 5M.
From the above, I have selected three that caught my attention:
View attachment 712667
Huh? Yes, the TTC owns the land on Kipling....but I don't recall there being any money in the budget to deliver this project in the next decade.......so why are we spending 20M on design here?
****
This next one seems more reasonable in price and will be of interest to many here:
View attachment 712668
*****
This last one is a fine project.....but that price......how? Is Mx somehow grifting on this one?
View attachment 712670
Better to have a design in place for the Western Yard encase funds show up down the road from all levels than starting design work when funding announce It will save years getting the yard built once funding is found with construction starting sooner than later.
That's definitely the one I need... Current 56 NB is 15 min service when I need it (there are a couple of extra runs for the high school crowd). Every 12 min is an improvement, though the forced transfer may eat into thatAll the TTC service changes for Sunday still aren't posted......
But i have most of it.........the format sucks so I'll just post one change for now.....because @PL1 would be interested. 51A/B will both run headway in the 24 m range.....but they are supposed to be inter-laced such that service from Donlands Stn to Eglinton should, in theory, improve to every 12' give or take.
Reading from the only public source, the GTFS open data sucks as it's like reverse engineering the schedule. We can only resort to waiting for Steve Munro to blog about their internal memo as the TTC doesn't officially provide that info now in a easily accessible webpage. The service summary would be the best bet but that sometimes don't get published till weeks into the board period.All the TTC service changes for Sunday still aren't posted......
But i have most of it.........the format sucks so I'll just post one change for now.....because @PL1 would be interested. 51A/B will both run headway in the 24 m range.....but they are supposed to be inter-laced such that service from Donlands Stn to Eglinton should, in theory, improve to every 12' give or take.
Reading from the only public source, the GTFS open data sucks as it's like reverse engineering the schedule. We can only resort to waiting for Steve Munro to blog about their internal memo as the TTC doesn't officially provide that info now in a easily accessible webpage. The service summary would be the best bet but that sometimes don't get published till weeks into the board period.
The maps and frequency changes aren't posted yet (which is a TTC failure).All the TTC service changes for Sunday still aren't posted......
Before the city reconstructed the Bloor/Dundas West and Kipling intersection. I heard TTC looked into adding a yard where the old abandoned movie theatre was. Didn’t the city said no to the TTC when they had other plans in place?