Complete?
Came here to ask if this sidewalk on the Queens Quay side is re-opened yet. I go to Lazy Barista now and then, and the stretch of walk where the cycle path merges with the sidewalk is always harrowing. Even with my head on a swivel the bikes keep ripping past me without slowing the slightest. And they've taken FOREVER even by Toronto standards to finish that few hundred feet of sidewalk and grass. Really irritating and poorly planned in my opinion.(Building looks great, though).Curious what the policy is for construction next to a major bike trail? They put the fence quite far into the path, creating a blind corner right where pedestrians are expected to merge with cyclists. To top it off they would frequently bump it out even further to allow room for vehicles to enter the site. Compared to the construction of T3 down the street, this was very poorly done.
Fence still in place.Came here to ask if this sidewalk on the Queens Quay side is re-opened yet. I go to Lazy Barista now and then, and the stretch of walk where the cycle path merges with the sidewalk is always harrowing. Even with my head on a swivel the bikes keep ripping past me without slowing the slightest. And they've taken FOREVER even by Toronto standards to finish that few hundred feet of sidewalk and grass. Really irritating and poorly planned in my opinion.(Building looks great, though).
The Google "popular times" live widget seems to indicate they are open and quite busy. Maybe that's just how they lock the door after closing?Fence still in place.
Maybe no need to go for coffee???
Lazy barista last night???
Can confirm that they were open as usual today, and very busy.The Google "popular times" live widget seems to indicate they are open and quite busy. Maybe that's just how they lock the door after closing?