innsertnamehere
Superstar
Believe Metrolinx board meetings are open to the public but the public is not allowed to comment during them, only observe.
I am going to the next Metrolinx meeting in June to convince them to build Eglinton West from Jane to at least Renforth. It would not even cost much.
don't think thats going to work my man, Metrolinx doesn't exactly have much money to be throwing around all willy-nilly like that.
Don't worry about it. I have a friend at Metrolinx who'll take care of building Eglinton West if I tell him to. Consider Eglinton West a done deal.
And if there's anything else you want built, you should speak now.![]()
I am going to the next Metrolinx meeting in June to convince them to build Eglinton West from Jane to at least Renforth. It would not even cost much.
Are these the Metrolinx board meetings? Are they open to the public?
Believe Metrolinx board meetings are open to the public but the public is not allowed to comment during them, only observe.
Don't worry about it. I have a friend at Metrolinx who'll take care of building Eglinton West if I tell him to. Consider Eglinton West a done deal.
And if there's anything else you want built, you should speak now.![]()
Metrolinx meetings are open, not sure if we can talk during the meeting, but we can talk after I think. I just think the UPX will be a massive failure.Leslie south side alignment.![]()
Leslie south side alignment.![]()
don't worry about it. I have a friend at metrolinx who'll take care of building eglinton west if i tell him to. Consider eglinton west a done deal.
And if there's anything else you want built, you should speak now.![]()
If you had paid attention during that time you have realized that Metrolinx never said the current launch location wasn't possible, only that they wanted it at don mills instead as it was easier there. They have to do piling and shore up the foundation of that new condo, which costs money and wasn't there when the initial EA was done. The local community convinced them to spend that money.
Should we be concerned that the tunnel tracker hasn't been updated in a week-and-a-half? They are usually good about updating it approximately once a week. Is there an issue with the headwalls at Caledonia?
Cave in!!! Just kidding. I have also been checking it. There have been stretches in the past where it hasn't been updated, I doubt that it reflects an actual construction problem. More likely that the person forgot to do it last week.
Posted this last week but I think it was one of the lost posts.....here is one property owner that is excited about this project
http://www.dundeereit.com/pdf/March-7-2014-Aviva-final.pdf




