From the Board Meeting's live stream this afternoon.
 
Unbelievably, we are still unclear on the contractual obligations...From today's TTC board meeting, speaking to the contracts (that were set years back):

Interim CEO Greg Percy said:



He did clearly state these contracts were written up many years ago...so why are we only reviewing this now?
Thats classic ttc and ML bureaucracy talking. Things can never be done concurrently and collectively
 
View attachment 661181

From the Board Meeting's live stream this afternoon.
Well the way I read that chart, the 2 orange lozenges represent a half month and a month, respectively. Even if the timeline is such that we are coming up to the "14 days" lozenge, I see room for at least 2 month-wide lozenges between the end of the one shown, and the start of revenue service. So that means 3 and a half months. And that means, not opening by September. And since target dates are NEVER met, probably not October either. Anyway, I'm in the mood for an orange lozenge now.
 
Well the way I read that chart, the 2 orange lozenges represent a half month and a month, respectively. Even if the timeline is such that we are coming up to the "14 days" lozenge, I see room for at least 2 month-wide lozenges between the end of the one shown, and the start of revenue service. So that means 3 and a half months.
Yeah, based on the pale white lines (wonder if this was cropped from another internal document) this seems to be the rough schedule:
  • Trial running: Wednesday to mid-July
    • Close out non-minor deficiencies by mid-July
  • Revenue Service Demonstration: mid-July to mid-August
  • Substantial Completion milestone: mid-August
  • Bedding In Period: mid-August to early November
  • Revenue Service: Late October (note the overlap)
  • Close out minor deficiencies: 🤷🏾‍♀️
 
Yeah, based on the pale white lines (wonder if this was cropped from another internal document) this seems to be the rough schedule:
  • Trial running: Wednesday to mid-July
    • Close out non-minor deficiencies by mid-July
  • Revenue Service Demonstration: mid-July to mid-August
  • Substantial Completion milestone: mid-August
  • Bedding In Period: mid-August to early November
  • Revenue Service: Late October (note the overlap)
  • Close out minor deficiencies: 🤷🏾‍♀️
what is the "bedding in period"?
 
what is the "bedding in period"?
Referenced a few pages back:
6. Next steps: formal trial run for 14 days, full revenue service demonstration for 30 days - then have a “bedding in period” to continue with testing (An extra period of testing recommended from the Ottawa LRT report)
Ford: Wont open until its 100% safe

Seems like a big emphasis on getting it right on opening day and avoiding an Ottawa LRT 2.0 on Eglinton
 
Yeah, based on the pale white lines (wonder if this was cropped from another internal document) this seems to be the rough schedule:
  • Trial running: Wednesday to mid-July
    • Close out non-minor deficiencies by mid-July
  • Revenue Service Demonstration: mid-July to mid-August
  • Substantial Completion milestone: mid-August
  • Bedding In Period: mid-August to early November
  • Revenue Service: Late October (note the overlap)
  • Close out minor deficiencies: 🤷🏾‍♀️
People on that betting site should give you a cut.
 
Can we please get a break from folks posting screenshots of the betting pages for the Eglinton Crosstown? We get it, it's an actual thing. But we've had like 3 posts in the last 5 pages with the same information.

Apologies, not trying to single out the poster of the most recent one, just want to put a request out there going forward.
 