North glazing coming along, slowly.
Yonge St. entrance is opening up as they work on the outdoor ground level stuff.
Loading dock is moved closer to 1 Front St. W.
They finalized the gas pipe. Diesel oil fill station I assume.
Lifting some prefab pipe fittings and maybe a heat exchanger?
Still pouring a little up top last week.

IMG_9900.jpeg


IMG_9894.jpeg


IMG_9896.jpeg


IMG_9898.jpeg


IMG_9899.jpeg


IMG_8347.jpeg


IMG_8348.jpeg


IMG_8279.jpeg


IMG_9775.jpeg


The sunrise reflection is not same with all the high rises blocking the light. I need to find the best day and angle.
IMG_8346.jpeg


From St. James Park
IMG_9876.jpeg
 
Pictures from the last 4 days.

Removing a base layer of concrete or styrofoam or ice.
IMG_8384.jpeg


Adding some fill
IMG_8397.jpeg


From ground level.
IMG_0078.jpeg


New temporary access walkway/bridge.
IMG_8395.jpeg


5th floor (mechanical level/airway ?) glazing still open.
IMG_8396.jpeg


Roofing on the north side one tier down.
IMG_8394.jpeg


This glass wall won’t be as noticeable as phase 1. The reflections could be good for pictures.
IMG_0067.jpeg


IMG_0077.jpeg


Phase 1. You’re richer than you think.Oh wrong bank.
IMG_0065.jpeg
 