News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6K     0 

Wonder why they're lowering what looks to be a crane piece into the tunnel.......







thumbnail_IMG_2267.jpg
 
The Scarborough RTs have started to be hauled away;

3026 on Nov. 5
3027 on Nov. 6
300x? unit spotted on a flatbed @ McCowan Yard on Nov. 9
 
Halton has a tendency to make their display pieces operational.

This happened with the Gloucester car.

That may prove a little more difficult with the SRT cars - unless HCRR intends to construct a LIM propulsion roadbed. But certainly they could be powered up and made occupiable. Or towed somehow (Large Witts certainly pulled trailers LOL).

Never say never.

- Paul
 
Since they wouldn't run anymore, there shouldn't be as much of a need to harvest every spare part, no?
Better to have the parts and not need them, than to need them and not have them.

Especially when it comes to cosmetic parts. PCC 4000 is kept under lock and key because they're afraid a vandal would steal parts from it there was free access given to it.
 
perhaps Halton may also be able to obtain some bits and pieces from Vancouver’s Mark Is as they are retired, rather than rely solely on what the TTC was able to part with?
 

Back
Top