Speaking of which - are they any closer to switching sides of the Rainbow Valley Bridge yet? It seems that they poured the final layer of concrete back in April....
I think they’re trying to get as much work done on the SUP before switching over due to ease of access from the current bridge deck. Should still be on track for end of 2026 completionSpeaking of which - are they any closer to switching sides of the Rainbow Valley Bridge yet? It seems that they poured the final layer of concrete back in April....
The one parallel to the Whitemud or the Bulyea-Brookside connector at 142 St?They poured the deck for the new pedestrian bridge. Looks good to open by the end of the year, couldn’t get any pics because it’s a death zone driving there