ntt1
Active Member
Well, I guess we lasted almost a year without a construction slowdown around that area of the AHD, LOL.
I wonder when we’ll reach 1.4 million within city limits. Then, we’ll be overdue for those semi-directional flyoversView attachment 654656
Found the original ultimate concept for the Terwilliger/ Henday interchange.
Sigh...
This was the last concept plan from 2018 that was likely axed when they decided to go with the "expressway" option instead of free-flowing. Now that the interchange with lights is already being built, this configuration probably won't happen any-time soon until the full 170 st freeway needs to be builtView attachment 654656
Found the original ultimate concept for the Terwilliger/ Henday interchange.
Sigh...
Now that the interchange with lights is already being built, this configuration probably won't happen any-time soon until the full 170 st freeway needs to be built
That’s cause I think it does have a lot left. Thye couldn’t do the road base until the retaining wall was done, it looks to me when driving through they are getting close to a rough sub grade but now need to do drainage utilities. I couldn’t tell thought what that state is, if that’s getting close to being done you will see a roadway start to from pretty quickly.I wish there was a clearer view of the bus lane. The retaining wall looks almost done but the actual roadway looks like it still has lots left to do.