Major delays on the bridge starting Thursday. Not sure what that could be, or why they would reduce more lanes?
 
Screenshot 2025-02-19 164841.png
 
There are 4 box girder sections on site and this morning they are prepping to bolt them together to assemble two spans. This is all being done on the north side of the site (westbound lanes) alongside the rainbow valley ski hill.

I'm very curious to know how they plan to get them moved over to the south (eastbound) lanes to stage for the final lift without disrupting traffic.
 
Last edited:
There are 4 box girder sections on site and this morning they prepping to bolt them together to assemble two spans. This is all being done on the north side of the site (westbound lanes) alongside the rainbow valley ski hill.

I'm very curious to know how they plan to get them moved over to the south (eastbound) lanes to stage for the final lift without disrupting traffic.
I can’t figure that out either. They can’t lift them over and keep traffic moving. My engineering mind can’t crack this one. You’d have to transport them somehow.
 
They’ll have a stop light on the eastbound exit onto.AHD exit from Terwillegar Drive.

Also, a lot of the retaining wall up on the bus route from 53 Avenue to Terwillegar Drive.
 