buildings
Active Member
half a mil for a one bedroom row house? no.
I stand corrected. I see that a grand total of 5 have sold which by the standards of this community does kind suck for sales. Hopefully actually having a show home will allow them to move something.Aren’t all the green ones available?
I struggle to see who these are for. If they're going for the elderly downsizers who still want a yard it almost makes sense, except that they have stairs to get into the house which makes them not very accessiblehalf a mil for a one bedroom row house? no.
My parents love the idea and would definitely consider them but it does seem odd that they added stairs, which basically kiboshes the accessibility they're trying to sell here.I struggle to see who these are for. If they're going for the elderly downsizers who still want a yard it almost makes sense, except that they have stairs to get into the house which makes them not very accessible
It seemed as if they'd be a more forgiving set of steps than my place has or more easily ramped, but the geometry might be just wonky enough to make fitting a ramp rather challenging.My parents love the idea and would definitely consider them but it does seem odd that they added stairs, which basically kiboshes the accessibility they're trying to sell here.
Renovation of the control tower main floor space for event space - the tower itself will be Phase 2.External ID
585039723-002
Job Type
Major Development Permit
Description
To construct an addition, exterior and interior alterations to a Community Service building, and construct exterior alterations to the site (Blatchford Annex).
Applicant
DUB ARCHITECTS LTD.
Status
Intake - Payment Required
Class of Permit
Create Date
April 9, 2025
Approval Date
Location
2755 - BLATCHFORD ROAD NW Plan 1822441 Blk 4 Lot 1
Neighbourhood
BLATCHFORD AREA
That said, I did see ~4 people up in the control tower earlier this afternoon. Two were dressed up in white "moon suit" coveralls, and two in office clothes.Renovation of the control tower main floor space for event space - the tower itself will be Phase 2.