I figured that this summer would be a huge boon for construction. Q4 should get them to 30%, and Q1 2025 to around 32%. Construction seems to be picking up, and with a tripling of the workforce, it seems like they have good momentum
I still think Standard General's Yellowhead job taking a whole extra year kneecapped a lot of road/curb/sidewalk progress on the VLW this summer and that's a big key piece of them saying they plan to triple workforce for 2025. That was a big chunk of their workforce dedicated to grinding to get that finally wrapped up this year.
 
I still think Standard General's Yellowhead job taking a whole extra year kneecapped a lot of road/curb/sidewalk progress on the VLW this summer and that's a big key piece of them saying they plan to triple workforce for 2025. That was a big chunk of their workforce dedicated to grinding to get that finally wrapped up this year.
Maybe. But I think SG was already in full force for the VLW this year
 
1732902376792.png


 
I drove WB and then EB across the SPR Bridge over Groat Road this afternoon. It's good to see this road open again.
The MUPs across the bridge look bigger than before, but I think I'll need to wait until summer before I can walk or cycle across it.
 
I drove WB and then EB across the SPR Bridge over Groat Road this afternoon. It's good to see this road open again.
The MUPs across the bridge look bigger than before, but I think I'll need to wait until summer before I can walk or cycle across it.
I walked across the bridge today, and the paths are very wide. I am very pleased with the outcome.
 
Want to support TOD along the west valley line?

Please add comments of support to this rezoning on 95ave nearby the future glenwood/sherwood stop! 3 homes becoming a potential 6 story apartment.

 