So, guesses on what the goal is for the SPR closure West of Groat? The road is closed until Nov. 2023 (this fall, 5-6 months from now). the road is being completely removed, from ROW edge to ROW edge. Everything is gone. and i doubt it'll be replaced by Nov, even in temporary form. any thoughts on this?
Here's the blog post regarding the work. I don't have photos of the excavations happening right now, but when i was through there last week, everything is gone.
Edit: a pic from across the ravine. Foundation work is just starting on the west side of the bridge, some of the equipment in the background is working on the road itself.
They've been full tilt slingin' those caisson piles, even saw them working on the Saturday of the long weekend. Lotta progress been made since they tore the old bridge out just over two months ago.So, guesses on what the goal is for the SPR closure West of Groat? The road is closed until Nov. 2023 (this fall, 5-6 months from now). the road is being completely removed, from ROW edge to ROW edge. Everything is gone. and i doubt it'll be replaced by Nov, even in temporary form. any thoughts on this?
Here's the blog post regarding the work. I don't have photos of the excavations happening right now, but when i was through there last week, everything is gone.
Edit: a pic from across the ravine. Foundation work is just starting on the west side of the bridge, some of the equipment in the background is working on the road itself.
View attachment 479686
I wonder about manure.I don't think TransEd is competent at planting vegetation either
View attachment 479569
View attachment 479570
Are you talking about the grass that dies back every winter and grows back every spring?I don't think TransEd is competent at planting vegetation either
View attachment 479569
View attachment 479570
Are you talking about the grass that dies back every winter and grows back every spring?
This makes sense. From what i saw of the old road, I'm betting SPR is going to be regraded, not just replaced. the old one was level/higher than surrounding roads and properties, I'm betting the new one is 12"-24" lower to drain better. this would impact all the storm sewers in the area, as well as require new roadbed, compaction, etc. all of which seems to be a LOT to get done in 6 months. getting grading and drainage redone, and a temp street surface in before snow flies makes sense to me. I'm betting they have to reclose SPR next spring to put in the actual pavement, railslabs, track, etc.They've been full tilt slingin' those caisson piles, even saw them working on the Saturday of the long weekend. Lotta progress been made since they tore the old bridge out just over two months ago.
I'm guessing with the bad publicity the City got over businesses struggling along the LRT construction line, they want Marigold to complete as much infrastructure as possible in this closure window for the rail ROW and utilities to possibly minimize future impacts of Stony Plain Road being haphazardly closed over the course of a few years. Roads/sidewalks can be roughed in for the time being and rebuilt properly once the bridge is nearing completion--this section of road is not an arterial until that opens anyway.