Talking to a TTC momager for Kipling Tunnel work that shoddy workmanship regarding the membrane for waterproofing fell apart after 7 years in place of 25+ is the reason for digging the tunnel up. It is supposed to be completed by December and what year. Other than digging the top off from where the work been the last year to the station entrance, nothing else been done since then. Did some shooting this time.
If it this bad for TTC tunnel, what is it like for the rest of the tunnel that was done at the same time, unless TTC had someone doing their own tunnel and EllisDon using someone else.
TTC needs to do something with their PA system as you can very rare understand what been said to the point I herd something about Line 1 and shuttle buses at Yonge Station while walking to get a 2 train.
Was surprised a youngers in the rail fan seat with his mother as the trap wasn't cross the driver area and can't recall when I last saw this.