News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6K     0 

Shuttle train on line1 is such a mess
While on a southbound train approaching Wilson

Operator announcement "This train will turn around at Wilson to be a northbound train"

Staff on platform "This is southbound train"!!!

Train destination sign "Vaughan"

Operator announcement "This is a northbound train"

Staff on platform "This is southbound train"!!!

Figured the staff on the platform were wrong so I stayed on the platform, but then of course the train continued south.
 
While on a southbound train approaching Wilson

Operator announcement "This train will turn around at Wilson to be a northbound train"

Staff on platform "This is southbound train"!!!

Train destination sign "Vaughan"

Operator announcement "This is a northbound train"

Staff on platform "This is southbound train"!!!

Figured the staff on the platform were wrong so I stayed on the platform, but then of course the train continued south.
I remember being at st george with no closures and instead of the line 2 for kipling announcement the train said OUT OF SERVICE (out loud and on the screen I believe) Everyone just boarded and of course the train was not out of service..
 
Next round of TTC service improvements announced.

Changes effective May 12th, (next Sunday)


Routes affected:

1715103056394.png


I await the details as the service summary isn't up yet.
 
That's not a service improvements list. It includes 92 which is getting a substantial cut, pretty much in all periods!

The mayor held a press conference billing it as such, please feel free to email her w/your complaint. LOL

***

The majority of the non-construction diversion changes are improvements, but many quite modest, reducing headways by less 1M . Which was my point. The presser made it sound better than it is.

Notable also, no subway improvements at all.
 
That's exactly what I was just about to make note of. While there are certainly cases where there are some improvements (ie: Service on the 95B York Mills having service hours extended); a lot of this is just service reallocation, or service being temporarily increased due to vehicle storage constraints (ie: 301 Queen).

The fact that they still wont improve service on either Line 1 or Line 2 is a joke. During the mid-day periods its common to see trains on both lines being crammed due to inadequate headways, and dont even get me started on the early afternoon rush-hour where service is a joke and trains on both lines are packed to capacity.

So in saying all that, when is Rick Leary going to be fired?
 
Stolen from Reddit but the condition of a lot of the tracks are terrible, this is the 506 but even the 501 has some terrible section despite being closed for what like 5+ years?

501 (my photo)
1715096145809.png


506 from reddit:

1715125266758.png


1715125293871.png
 
  • Like
Reactions: max
Stolen from Reddit but the condition of a lot of the tracks are terrible, this is the 506 but even the 501 has some terrible section despite being closed for what like 5+ years?

501 (my photo)
View attachment 562150

506 from reddit:

View attachment 562269

View attachment 562270
Really can't blame TTC for this as this is what heavy traffic does to roads. If it is the rails, then TTC needs to rethink how to design the base, but most of all a topcoat that will with stand the heavy traffic.

Looking at Detroit LRT tracks in March, I guess they have the right idea for building the road and the tracks for the QLine by using rebar around the rails as well in the top coat. Have seen no change in the road surface since the line when into service May 12, 2017 and the road completed in 2015. I always thought it was over kill seeing it during construction and looks like I maybe wrong.

Haven't had a close look at Buffalo LRT since they rebuild the ROW for mix traffic.
 

Back
Top