Passed by Museum station today. It appears the elevator has started taking its shape as I spotted the curve of the structure peaking out.
 
  • Like
Reactions: PMT
In the latest Major Projects Report to next week's TTC meeting we get an updated schedule for this program.


From the above:

View attachment 659415

Rosedale had progressed 2% over the intervening 2 months! What fabulous progress.....they still seem to be committing to it opening this month.

College advanced 1% in the same timeframe. Wow....
Rosedale station still doesn't have their elevators completed so they obviously missed that deadline. Not sure when that will be completed. :(
 
As part of the TTC’s Easier Access Program August 25 -September 30 is catch basin relocation at Old Mill. August 30:

IMG_4567.jpeg
 
Rosedale station still doesn't have their elevators completed so they obviously missed that deadline. Not sure when that will be completed. :(

Rosedale is complete. Not sure when they will open, but should be imminent, hoarding is down.
 
Lawrence Station Elevator work is getting close to done. Transit Toronto has pics of the new/renovated Mezzanine and Hoarding around the elevators are down, but fencing remains up with further finishing work required.

1756834594985.png


1756834624948.png


1756834661392.png


Credit for Images above - Transit Toronto

 
Lawrence Station Elevator work is getting close to done. Transit Toronto has pics of the new/renovated Mezzanine and Hoarding around the elevators are down, but fencing remains up with further finishing work required.

View attachment 678352

View attachment 678353

View attachment 678355

Credit for Images above - Transit Toronto

Interesting given that TTC elevator schedule you shared indicated Q2 2026 for Lawrence.

With Rosedale being almost done (if not already), I wonder how Christie, Warden, and Summerhill are progressing which call for 2025 openings.
 
I wonder how Christie, Warden, and Summerhill are progressing which call for 2025 openings.

Warden is progressing well.

The Elevator Shaft between Line 2 and the Mezzanine is in place with what looks like a cab in the hole. The hoarding is gone so I suspect it will be done shortly.

You can't really see the elevator from Ground to the Mezzanine but the exterior walls of the entrance vestubule are in place and if I had to fathom a guess they are assembling the elevator as we speak.

One interesting tidbit is that the signs indicated a 2027 opening for the elevators, that was later covered over so now there is no actual date for the opening listed. Based on what I am seeing, it looks like at least one of the elevators will open later this year.
 
Lawrence Station Elevator work is getting close to done. Transit Toronto has pics of the new/renovated Mezzanine and Hoarding around the elevators are down, but fencing remains up with further finishing work required.

View attachment 678352

View attachment 678353

View attachment 678355

Credit for Images above - Transit Toronto

This looks pretty nice. I hope the rest of the station gets the same ceiling as part of a broader renovation.
 
This looks pretty nice. I hope the rest of the station gets the same ceiling as part of a broader renovation.

I agree the new ceiling finish is more attractive, too bad they stuck w/the clunky looking box lighting though.

But I have no expectation of them renovating the balance of the station, and if they do, I imagine they won't bother trying to match the finishes. That's been an ongoing sore point between myself and certain staff at TTC.

Either match everything properly, contrast it just perfectly (so that the new makes sense w/the old), or do a whole station. Weird mismatched stuff that shares no design language drives me nuts!
 
Lawrence Station Elevator work is getting close to done. Transit Toronto has pics of the new/renovated Mezzanine and Hoarding around the elevators are down, but fencing remains up with further finishing work required.

View attachment 678352

Holy smokes is that a fully intact TTC ceiling I am seeing???
 