Complete speculation but the super columns line up pretty much perfectly with where phantom Scotiabank Arena columns if it extended above the corridor would go (or will in the future).

IMG_4060.jpeg

IMG_0035.jpeg


If MLSE ever wanted to preserve the option of replacing their stump with a tower, they’d need to coordinate exactly at this moment or it’ll be too late.

The perfectly positioned structural wall and two columns larger than the rest , including the crane well in Pesto’s and Civdis’ photos look very much like they could support a tower above the track.

img_4846-jpeg.740292

Photo: @pesto
img_3966-jpeg.740251

Photo: @Civdis
 
Apologies as I’m sure this has been said elsewhere, but I can’t get a straight answer from MX docs

When is the current expectation of when lakeshore trains will actually start using these new platforms?
 
Apologies as I’m sure this has been said elsewhere, but I can’t get a straight answer from MX docs

When is the current expectation of when lakeshore trains will actually start using these new platforms?

On or about October 32rd, 2091.

... seriously, they've blown by the November 2025 originally stated opening date so your guess is as good as anyone else's. This is the last update they provided and it hasn't been updated since February so safe to say Metrolinx isn't interested in sharing any estimated construction completion dates, let alone opening dates for trains to run.

Screenshot 2026-06-04 at 5.13.51 PM.png
 
Apologies as I’m sure this has been said elsewhere, but I can’t get a straight answer from MX docs

When is the current expectation of when lakeshore trains will actually start using these new platforms?
There is a document that says 2029 is when trains will run through there lol
 