I misunderstood it as the crew putting up the hoarding waking him up. 8:30AM is now early for me and I love it.
 
I meant I enjoy getting up at 8:30 and now they're gonna start making noise at 7:30, so boo) On the other hand I love this project. I should move though, since it's going to be solid contruction there for years.
 
I meant I enjoy getting up at 8:30 and now they're gonna start making noise at 7:30, so boo) On the other hand I love this project. I should move though, since it's going to be solid contruction there for years.
I live outside of construction, it's not that bad, at least 20+ floors up. This at least has a bit of distance from Yonge street as well, at least for the first phase.
 
I believe a comment about "shit" getting "real" would be appropriate at this juncture...

20180321_170837.jpg
 

Attachments

  • 20180321_170837.jpg
    20180321_170837.jpg
    248.2 KB · Views: 771
caisson drilling imminent? (see bottom right of pic above) if that's the case, strange that they haven't applied for building permits yet.
 
caisson drilling imminent? (see bottom right of pic above) if that's the case, strange that they haven't applied for building permits yet.

Shoring permit was issued last summer I think

Application: Building Additions/Alterations
Status: Under Review
Location: 1 YONGE ST TORONTO ON M5E 1E5
Ward 28: Toronto Centre-Rosedale
Application#: 17 220841 BLD 00 BA
Accepted Date: Aug 22, 2017
Project: Other
Work: Shoring
Description: Proposed shoring and excavation for soil remediation on existing lot.
 
Noticed today that the east west trench had some half circle foam forms. It’s a shallow trench and I thought it might be for power, however, the shape baffles me. Perhaps it’s related to the soil remediation. Anyhow the other item to note is the appearance of a mobile crane, currently being assembled.
2AD8F9C4-4201-41C1-BE3D-AEEDAE7F779B.jpeg
D8D821D6-B4C0-4404-A0B6-F49799552433.jpeg
523C749C-F41D-4AB5-AC51-298DCB235836.jpeg
 

Attachments

  • 2AD8F9C4-4201-41C1-BE3D-AEEDAE7F779B.jpeg
    2AD8F9C4-4201-41C1-BE3D-AEEDAE7F779B.jpeg
    221.4 KB · Views: 996
  • D8D821D6-B4C0-4404-A0B6-F49799552433.jpeg
    D8D821D6-B4C0-4404-A0B6-F49799552433.jpeg
    226 KB · Views: 1,082
  • 523C749C-F41D-4AB5-AC51-298DCB235836.jpeg
    523C749C-F41D-4AB5-AC51-298DCB235836.jpeg
    125.9 KB · Views: 964
Noticed today that the east west trench had some half circle foam forms. It’s a shallow trench and I thought it might be for power, however, the shape baffles me. Perhaps it’s related to the soil remediation. Anyhow the other item to note is the appearance of a mobile crane, currently being assembled. View attachment 138205View attachment 138206View attachment 138207

Those plastic circle like things are patterns for the shoring machine to follow when they start drilling into the ground. They have to drill every third hole, fill with concrete then come back and repeat with the next hole along the mold. They keep going until they have a complete wall all around the site
 

Back
Top