Today's action. Three drilling rigs on site now.

20180406_130356.jpg
20180406_130403.jpg
20180406_171014.jpg
 

Attachments

  • 20180406_130356.jpg
    20180406_130356.jpg
    264.9 KB · Views: 823
  • 20180406_130403.jpg
    20180406_130403.jpg
    273.5 KB · Views: 807
  • 20180406_171014.jpg
    20180406_171014.jpg
    262.5 KB · Views: 800
That's awesome. Not wasting any time at all. This project, the Well, CiBC square are moving at a very good clip. Wish The One can catch up, but it's off topic here.
 
Odd they wouldn't excavate the entire site all at once. Seems a waste to shore in the middle of the lot and then do the perimeter later.
 
on a project this scale a small wall of shoring is pennies, especially when it eliminates the risk and carrying cost of building a massive, oversized garage years before it is needed.
 
Pic today and one yesterday. The pace is good. They start around 7:30 and pack up around 3:30. There were 6 concrete trucks on site at one point today.
AAC22A0F-6F6B-4952-8C21-442061973612.jpeg
AE477309-F954-4D8D-B0DB-DC6042A9B337.jpeg
 

Attachments

  • AAC22A0F-6F6B-4952-8C21-442061973612.jpeg
    AAC22A0F-6F6B-4952-8C21-442061973612.jpeg
    216.7 KB · Views: 785
  • AE477309-F954-4D8D-B0DB-DC6042A9B337.jpeg
    AE477309-F954-4D8D-B0DB-DC6042A9B337.jpeg
    209 KB · Views: 745
It's how you use it.

42
 
Probably stating the obvious, no work today. But nice contrast in the pic between the black wall and the white ice covering the site. Could probably play a pickup game of hockey here today, bring your Humboldt Broncos jerseys, at least in your thoughts.
A1DBD6AE-C9E6-4107-8299-2DF240757313.jpeg
 

Attachments

  • A1DBD6AE-C9E6-4107-8299-2DF240757313.jpeg
    A1DBD6AE-C9E6-4107-8299-2DF240757313.jpeg
    214.7 KB · Views: 1,045

Back
Top