steveve
Senior Member
Today:
I love the second photo!Today:
![]()
![]()
![]()
![]()
![]()
Here is a zoom shot of the crown as seen from Yonge and Roxborough this evening; it appears they are actually adding insulation materials before installing the cladding pieces afterwards:Photos taken today, Friday (May 15). Like ImmenselyMental above, I happened by as one of the sections of the west Rail Climbing System was being taken down. The RCSs installed the skin, and with 9 sections for each of the 3 RCSs to be taken down, 2 more were removed today, leaving 17 of 27 total sections left.
Something new, or at least something I'd not noticed before, but there are now some windows on the crown, at least on the north side, just visible in the second photo on the left side of the box enclosing the tuned mass damper.
View attachment 736932View attachment 736931View attachment 736930View attachment 736945View attachment 736944View attachment 736943View attachment 736942View attachment 736941View attachment 736940View attachment 736939View attachment 736938View attachment 736937View attachment 736935View attachment 736934View attachment 736933