Unless they can resolve the issue of the large number of homeless people causing disruptions every night at the Yonge and Bloor intersection, I doubt that area can develop a proper nightlife atmosphere. I live in the neighborhood as well!
^Maybe they are prepping to install that mezzanine there...![]()
Then they should’ve waited to hoist that beam until they were ready. But as I’ve said, by the time they are, SkyTower will have surpassed 300m and Tridel can longer claim to have the first ‘building’ in Canada to hit that mark. Oh well, such antics are to be expected when developers are in a skyscraper race (see NYC in the late 1920s).I think that they have to wait until the remaining concrete is bored before they can move forward with the tuned mass damper as it is design for the buildings weight and not having those corners complete would be hundreds of pounds of difference between what the damper is designed for and what the current building is also if you look at hawcs pictures You can see that the core is still three levels down so they cannot close the elevator core yet
SkyTower will have surpassed 300m and Tridel can no longer claim to have the first ‘building’ in Canada to hit that mark.
I was referring to what would happen if they had waited until they were ready to work on the crown before having the ‘300m ceremony’. There’s a good chance that SkyTower would cross that mark by then.They can claim the first building in Canada to hit 300 metres FOREVER. They were the first and first doesn't change. The only thing they wont' be able to claim soon is the ONLY building.