Today.
IMG_1757.jpeg


IMG_1758.jpeg
 
Photos taken today, Friday (Aug. 1). Since I posted a week ago, all the blue corner scaffolds have been placed to around level 82 to install the concrete corners for the last stretch of floors to the top. Last week, only the SE corner was up, with the NE corner being pulled up as I shot. Also at the top, the external elevator has added a few floors, to levels 80 and 81. Down the tower, the black Rail Climbing Systems installing the building's skin remain where they were last week, at levels 64 and 65, though the mini-RCS on the south face is up 2 levels to 62.

Starting with the view up Yonge Street at Dundas, then from Charles and Yonge, showing shadows and reflections... and details of the top and the RCS levels. Then, by Holt Renfrew on Bloor a block to the west, on to Cumberland east of Bay, the tight shot showing the corner scaffolds all up around level 82. Yonge and Bloor shots, then Wellesley and Church, finishing off with a view from Queen's Park, and from a bit north of there.




UTIMG_0920.jpg
UTIMG_0673.jpg
UTIMG_0591.jpg
UTIMG_0612.jpg
UTIMG_0597.jpg
UTIMG_0737.jpg
UTIMG_0800.jpg
UTIMG_0314.jpg
UTIMG_0346.jpg
UTIMG_0502.jpg
UTIMG_0560.jpg
UTIMG_0520.jpg
UTIMG_0835.jpg
UTIMG_0106.jpg
UTIMG_0239.jpg
 

Back
Top