Today

20250707_1937052222.jpg
 
anyone know when the tuned mass damper may be installed? And do we know how it’s going to be lifted into place? Presumably by helicopter??
Is there a helicopter that could lift it?
I think they would lift it like one would eat an elephant. That is, at one piece at a time.
In fact, Utakata is correct! The Tuned Mass Damper will be be assembled from plates after being hoisted to the roof over the course of weeks by the crane!

42
 
Then Tridel will continue construction of the remaining floors; and then finally the crown.
Enough trolling. If you post again about these non-happening floors, your UrbanToronto account will be closed.

42
 
Yeah it's made pretty evident with the RCS being completely dissembled for the core that we are at final height You can also tell by looking the steel columns that there are no additional floors The building has been crowned and we should all revel in the beauty that it currently is because those extra six floors would have been nice but I actually like the 85 story better
 

Back
Top