July 3, 2025

1000007579.jpg


1000007580.jpg


1000007581.jpg
 
One last thread update from me........for now............ Photos taken yesterday, July 3rd, 2025:

First from Cumberland, just east of Bay:

DSC05567.JPG


Then from Hazelton, just north of Yorkville:

DSC05578.JPG


DSC05579.JPG


Finally, from Devonshire Pl:

DSC05601.JPG


DSC05602.JPG
 
Photos taken today, Friday (July 4). Since I posted last Friday, the work on the corners has moved up all around the tower, to level 80. Presumably, the inset blue forms at the top will soon be removed as the corners rise. Also, presumably, the final look of the top will start to take shape once the corners reach level 85. I guess those two beams were attached last week for a purely ceremonial purpose - to surpass that 300m threshold - as the tower wouldn't have otherwise risen until those corners reached the top. (Oh, and to beat any other projects closing in on the height going up down the road...)

Further down, the east Rail Climbing System (RCS) installing the skin is up one floor to level 64, the north and west RCSs remaining at level 63.

Starting with the view from Yonge and Dundas, moving up to shots around Charles and Yonge, including shots from Charles west of St Nicholas and a shot from the alleyway off Balmuto. Then a view of the top from up Balmuto, then from Cumberland east of Bay with a tighter shot of the top showing those corner floors at level 80 being worked on. The view from the NE corner of Bloor and Yonge follows with lotsa glare, a shot from the bank entrance nearby, and a closer look at the east RCS and the top. Then, from Wellesley west of Church, from College and Queen's Park, then from Victoria College. Finally, a shot from the west, the tower in the distance over the sidewalk at Bloor and Perth near Dundas West.



UTIMG_5821.jpg
UTIMG_5546.jpg
UTIMG_5680.jpg
UTIMG_5229.jpg
UTIMG_5236.jpg
UTIMG_5274.jpg
UTIMG_5309.jpg
UTIMG_5359.jpg
UTIMG_5514.jpg
UTIMG_5446.jpg
UTIMG_5397.jpg
UTIMG_5753.jpg
UTIMG_5149.jpg
UTIMG_5194.jpg
UTIMG_5906.jpg
 
anyone know when the tuned mass damper may be installed? And do we know how it’s going to be lifted into place? Presumably by helicopter??
 
anyone know when the tuned mass damper may be installed? And do we know how it’s going to be lifted into place? Presumably by helicopter??
I think they would lift it like one would eat an elephant. That is, at one piece at a time.
 

Back
Top