evandyk
Senior Member
He was asked to call it that!Petition to rename it Champagne Corner for accuracy and alliteration
He was asked to call it that!Petition to rename it Champagne Corner for accuracy and alliteration
I've been trying not to say this out loud so thank you You know how places get nicknames it's by one person calling it that one time and then it catching on sometimes it takes years sometimes it takes two days everyone has a right to call it what they want as long as It isn't offensiveboy - people have little to be worrying about if they care that much about what one poster calls an intersection
Yeah, I personally enjoy the nickname, it's fitting for the area. And kind of comical.I've been trying not to say this out loud so thank you You know how places get nicknames it's by one person calling it that one time and then it catching on sometimes it takes years sometimes it takes two days everyone has a right to call it what they want as long as It isn't offensive
It looks like we have ascended to the final cut away level. Should only have roughly 11 to 12 floors to go plus rooftop after that? It is hard to tell tho.
I'm pretty sure there's only 5 floors left?It looks like we have ascended to the final cut away level. Should only have roughly 11 to 12 floors to go plus rooftop after that? It is hard to tell tho.
Pinnacle is climbing fast. Sometimes I feel like the two buildings are racing each other to be the first.
There are six floors after the mechanical level so if we are on the final floor of the mechanical level that would put us at 6:00 to 7 floors left plus the crownThey were only at 71 last week
That was a reference to the outside elevator, which was at 71, but they were doing concrete work on the mechanical levels, which are 77 & 78.They were only at 71 last week
We can kinda math this one out. It is currently slightly taller than Number One Bloor, which is around 260 M. We can use that as reference. I say it give or take has 10 meters to 15 meters on One Bloor, so the gap should be around 38 meters.That was a reference to the outside elevator, which was at 71, but they were doing concrete work on the mechanical levels, which are 77 & 78.