Both extensions were in Mobilinx contract, but were removed when they were cancel back in 2019. Mobilinx will not be going after those extensions with ML wanting someone else doing the work.Ah, I assumed it was awarded, and that Ford's announcement came with the award. I guess I've not been paying enough attention - until recently I thought they'd already started constructon!
If there there a contractor to do the loop, ML has them hidden in the backroom until the revised EA to extend the loop is completed by year end. Latest word for ML that they are to appearing before all 3 councils in spring 2026 compared to November 2025. Even then it will be lip service to say we are doing something with no dates and timeframe been given.
The line cannot go into service until the loop is built that includes a 5-6 month of disruption for the Burnhamthorpe intersection to rebuild it and place the wye that was to be done in 2024 when tracks were place there. Unless a 7/24 construction is taking place to deal the single lane of traffic in all directions and will be a mess. Topflight wye was built twice and took over six months both times to do with a fully close intersection with a single lane of traffic in both direction in the southbound lanes on Hurontario. Cannot do that with Burnhamorpe today.
Last edited: