Construction on the greenway trail will start this month, according to a construction notice posted today on Metrolinx's website. Construction is supposed to last until spring 2027. The south sidewalk on Dupont will be closed for the full two years.
Finally! I know a lot of us in the area had been waiting for this to start for quiet some time. Glad to see it's starting construction.
 
Here's the current state of the Davenport end. I'm curious to see how they're going to use this end for access - off Foundry and through the hydro corridor (see chain link fences in 3rd image), perhaps?

IMG_4194 Copy.jpeg

The stairs have seen better days...
IMG_4186.jpeg


IMG_4182.jpeg
 

Attachments

  • IMG_4182.jpeg
    IMG_4182.jpeg
    369.3 KB · Views: 34
Yeah, those death stairs are supposed to be replaced with a ramp that slopes down eastward to Davenport. Pretty sure there are renderings earlier in thread. Definitely looking forward to that change, especially in winter.
 
Davenport Road will see lane reductions underneath the rail bridge from June 23 to June 30 for greenway construction. Bike lanes will be closed for the week, and one sidewalk will be closed as well.
 
Here's the current state of the Davenport end. I'm curious to see how they're going to use this end for access - off Foundry and through the hydro corridor (see chain link fences in 3rd image), perhaps?

View attachment 659722
The stairs have seen better days...
View attachment 659723

View attachment 659725

Theres now a trail that goes through Earslcourt Park, even though Google Maps refuses to show it. They should connect the end of the greenway trail to it. With a signalized crossing or something.

One could then bike through the cemetery north of the park and continue up until Eglinton cycletracks and the Beltline.

A revitalization of the hydro trail and connection to the west with a pedestrian bridge over the GTS rail would be nice too.

1750780340731.png
 
Theres now a trail that goes through Earslcourt Park, even though Google Maps refuses to show it. They should connect the end of the greenway trail to it. With a signalized crossing or something.

One could then bike through the cemetery north of the park and continue up until Eglinton cycletracks and the Beltline.

A revitalization of the hydro trail and connection to the west with a pedestrian bridge over the GTS rail would be nice too.

View attachment 661266

The connection over the railway corridor (or under rather) is supposed to be provided via the Gunns Road extension, whenever that gets done. At least that was the plan. Not sure if it's happening.



Screenshot_20250624-130300.png


The green would be the MUP's relevant to your route.
 
Theres now a trail that goes through Earslcourt Park, even though Google Maps refuses to show it. They should connect the end of the greenway trail to it. With a signalized crossing or something.

Unless I mistake your meaning, there is a signalized crossing at Davenport Rd and Caledonia Park Rd, so it's part of the way there at least.
 
The connection over the railway corridor (or under rather) is supposed to be provided via the Gunns Road extension, whenever that gets done. At least that was the plan. Not sure if it's happening.



View attachment 661318

The green would be the MUP's relevant to your route.
Oh wow I didn't even know this was being considered at all! Thats great.
 
Oh wow I didn't even know this was being considered at all! Thats great.
Unfortunately, there has been almost no information available as to when this St. Clair - Keele project will begin. Hard to believe it's been seven years since that consultation FFS!
 
Unfortunately, there has been almost no information available as to when this St. Clair - Keele project will begin. Hard to believe it's been seven years since that consultation FFS!

Penciled in for 2031 currently.

Don't take that as gospel....these things change, often.
 