Toronto Model 06-13-25 Forma.png


Link to HD render
 
Last edited:
I think the external shaft is going up on the west side of the southwest corner of Forma, rather than the south side as I initially though it was.

@khaldoon based on your photos from yesterday, it also appears that forming work at the south end of the tower floorplate is roughly a level ahead of the north end. Here are a few photos I took of the construction site this morning:
20250620_105925 copy.jpg

20250620_110100.jpeg

20250620_110428 copy.jpg

20250620_110510 copy.jpg

20250620_110638 copy.jpg
 
I think the external shaft is going up on the west side of the southwest corner of Forma, rather than the south side as I initially though it was.

@khaldoon based on your photos from yesterday, it also appears that forming work at the south end of the tower floorplate is roughly a level ahead of the north end. Here are a few photos I took of the construction site this morning:

This graduated type of progression in high rise building is very common as it allows multiple trades/crews to work on the site at the same time (in this case, those setting up forms, those setting up rebar and conduits and those pouring concrete.)
 

Back
Top