When Metrolinx deferred the connection from Mount Dennis to Pearson to an unfunded Phase 2, back in 2010, the priced the connection to Renforth at $467 million. Hard to see why it need be $1.5 billion now.
I'm surprised it's so low, and I'm puzzled to understand how it could be that low
Looking at the Crosstown EA, the distance of the preferred alignment between Mt Dennis and Pearson was more than 12 km. This distance does not include the price of the interface with Pearson, which might include an overpass. The price of the Finch West LRT is $90 million/km in 2008 . That results in $1.1 Billion for this extension. Inflation should add $200M to 300M to that.
The ECLRT extension won't require a new MSF, so that cost needs to be subtracted. How much would the MSF cost? Leslie Barns was estimated at $350 Million and went up to $500 Million because of overruns. SELRT's MSF is $333 Million. I haven't seen a price for ECLRT's.
Also need to factor in the Pearson interface, which wasn't studied and the cost of new LRVs. How much that would cost is anybody's guess. All this considered, I'd guesstimate about $1 Billion on the low end, $1.5 on the high
Edit: the low dollar would increase the price as well.