News   GLOBAL  |  Apr 02, 2020
 11K     0 
News   GLOBAL  |  Apr 01, 2020
 43K     0 
News   GLOBAL  |  Apr 01, 2020
 6.9K     0 
Having experienced a few crush loads on the train now, I am bit concerned about this line’s capacity to handle peak hour commutes.

It should have been a full subway. I think upping the frequency and adding an additional car on the vehicles is something that will be needed in the near-term rather than long-term.
Lets revisit that after the hype has died down. Don't forget many of today's riders are foamers
 
They need to shut down the Leslie intersection to cars. Only let them turn west off of Leslie and come from the east to Leslie. Or build another ramp like the Celestica Lands have. Then there is zero interference until Don Valley station.

They also need to build two onramp clovers at the Don Valley Expressway so that cars don't need to cross the streetcar tracks there to get on the highway. Eliminating those two intersections will help a lot, considering they aren't even necessary intersections to have at all 😭
Integration of the new transit system and the highway system isn’t great. Note that a ton of money has just been spent on the Leslie-401 Interchange…and other than the Don Valley Parkway the next one is Victoria Park, not Don Mills.
 
The underground section is great. Very speedy. Stations are nice though a bit barren and overly white.

Think the underground section drives home what a bummer the surface sections are. The surface segments should have been an elevated metro line.

I remember a long time ago there was a user here that everyone kind of hated cause he was vehemently against LRT. Honestly, I think in retrospect he was right.

That said, I think with TSP the surface segments can be tolerable. We hit a string of green lights and though the train was moving kind of slow, it was at least moving consistently and so it wasn't that painful.

The segment between laird and Don Mills is idiotic. What a damn shame.
 
Do people not realize, in order to have "zero interference" between the portal and Don Mills, you'll have to fence the whole ROW off.

Similar to how the Rosedale Valley bridge took its' current form over time.

Say you eliminate the intersection at Leslie, you'll still have the TTC slowing down operations because a pedestrian might cross the ROW, or an errant motorist heading south on Leslie may ram into an LRV.

This is exactly the BS I mentioned in my post yesterday.

The only solution to the Leslie conundrum at this point is either building a flyover as @Voltz said, or closing the Sunnybrook Park stop altogether, and have the LRT cross over the intersection.

From the bottom of my heart, to all those who say the intersection needs to be closed - "Go Screw Yourselves".

Kindest regards,
- 20+ year North of Sheppard, 151 linear transfer-impacted Leslie resident.

Ps. Most of the traffic on Leslie is from pople who don't actually live on Leslie.
How can you have a flyover for Leslie when you have CP Bridge in the way??

You need to be 35 feet above the CP bridge to the underside of the flyover and what would the grade be to get the flyover back to grade for Don Mills station??
 
Left Kennedy at 7:40. Made it to Mount Dennis at 8:50. That included a 15 minute delay at O'Connor due to a door not working. Was all good otherwise. Regular Eglinton users (not tourists like me) on the Scarbough portion were quite happy. Were suprised at the speed and after what they heard of Finch it was all good. I was impressed as well. A game changer for the city.

IMG_2035.JPG
IMG_2034.JPG
IMG_2031.JPG
IMG_2030.JPG
IMG_2029.JPG
IMG_2028.JPG
IMG_2027.JPG
IMG_2026.JPG
IMG_2025.JPG
IMG_2024.JPG
IMG_2023.JPG
IMG_2022.JPG
IMG_2021.JPG


Photos of every station.

Mount Dennis

Keelesdale

Caledonia

Fairbank

Oakwood

Cedarvale

Forest Hill

Chaplin

Avenue

Eglinton/Yonge

Mount Pleasant

Leaside

Laird

Don Valley

Kennedy

And a few of the outdoor portion.
 
Holy crap. Both trains I rode between Oakwood and Eglinton slammed into emergency while going full speed in the tunnel. We ended up going half speed the rest of the way to Mount Dennis the first time. The second time we are currently waiting at Chaplin. Edit: now we’re going slow again between stations and I hear a nasty wheel flat I didn’t notice before.

No explanation the first time. Second time they said technical issue.
 
Today I rode Line 5 and for the first time rode Line 6.

My Route:
  • Line 5 from Mount Pleasant to Cedarvale,
  • Line 1 Cedarvale to Finch West,
  • Line 6 from Finch West to Humber College
  • Express Bus 906 from Humber College to Pearson Viscount
  • APM from Pearson Viscount to Pearson UP
  • UP Express from Pearson UP to Mount Dennis
  • Line 5 from Mount Dennis to Kennedy
  • Line 5 from Kennedy to Laird (stop at Canadian Tire)
  • Line 5 Laird to Mount Pleasant
Review of Line 5:
Good: Vehicle build, ride quality, acceleration, deceleration, speed (cars were not leaving us in their dust), decent wayfinding, announcements (I prefer the Metrolinx bilingual softer tone).
Needs improvement: Signal priority, announcement sound quality onboard the vehicles gets static clicks.
Summary: This is built as it should have been minus the choice to put the tracks in the middle of the road instead of along the south side. If you solve signal priority and the sound system issues inside the vehicles it will be near perfect.
Rating: Excellent, 4.5 out of 5

Review of Line 6:

Good: Decent wayfinding, decent stop design, it isn't a bus, no issues noticed with sound quality.
Needs improvement: Vehicle build, ride quality, acceleration, deceleration, speed between stops, signal priority.
Summary: There is something seriously deficient with how these vehicles have been built. The interface between the carbodies and the rails is full of vibration and friction. A ride along the rails should be smooth but somehow this felt like the vehicle was being dragged and there were obviously flat spots on many of the wheels, but the friction went well beyond that. I'm not sure if the wheels are slightly off perpendicular to the rail, have bad ball bearings, the brakes never fully release, or they have expanded regenerative braking to include regenerative driving and coasting... but something is off with these vehicles. The speed hit 50 km/h only once passing under highway 400, but most of the time seemed content going 30 km/h, and acceleration was abysmal.
Rating: Poor, 2 out of 5
 
Last edited:
Holy crap. Both trains I rode between Oakwood and Eglinton slammed into emergency while going full speed in the tunnel. We ended up going half speed the rest of the way to Mount Dennis the first time. The second time we are currently waiting at Chaplin. Edit: now we’re going slow again between stations and I hear a nasty wheel flat I didn’t notice before.

No explanation the first time. Second time they said technical issue.
Oh boy, this sounds like the random emergency braking issues that were being talked about, even days before the opening of this line.

How this still hasnt been resolved is beyond me. It's not like they've had 3,000+ days to figure it out.
 
Most of the traffic on Leslie is from pople who don't actually live on Leslie.

Who cares? I get so sick and tired of this absurd view that traffic may only be caused by immediate residents. Roads are to move people around from all over. It's like the literal point of a road. Am I not worthy to drive on certain roads I've paid for with my tax dollars, because I don't have a house on that road? Gimme a break. The only exception I can see to this is a residential side street being using as a main thoroughfare by thousands of commuters trying to get a short cut to and from work each day. But Leslie? Come on.

ps. Agree with the rest of your post. 🍺
 
Last edited:
Actually incredibly surprised with how good (particularly the tunnelled section) Line 5 is. It's move at the speed you would expect a subway too in the tunnels, and getting from Weston to Yonge as fast as we did was simply not possible before. Surface section has it's issues...but the insane slow orders and stop-and-go rules at green lights we saw on Finch seem to have been seriously corrected.
 

Back
Top