drum118
Superstar
April 15
As I pass the Mount Denise Station on the 32 heading to Yonge, an eastbound LRV departed the station. As it climb over Black Creek, the pans were reduced to haft the normal height as it got ready to entre the tunnel. Saw nothing for most stations, but Caledonia fencing has been removed for the walkway area with a number of vehicles at the station. Vehicles at Eglinton West station.
Nice to see the Yonge sidewalk complete. All the elevators were running from TTC platform to the LRT station as well the main entrance for Crosstown. Crew trying to clean the tiles on their knees and using special cleaning material for the entrance from the Main Crosstown entrance. Major inspection taking place with a lot of white hats.
As I pass the Mount Denise Station on the 32 heading to Yonge, an eastbound LRV departed the station. As it climb over Black Creek, the pans were reduced to haft the normal height as it got ready to entre the tunnel. Saw nothing for most stations, but Caledonia fencing has been removed for the walkway area with a number of vehicles at the station. Vehicles at Eglinton West station.
Nice to see the Yonge sidewalk complete. All the elevators were running from TTC platform to the LRT station as well the main entrance for Crosstown. Crew trying to clean the tiles on their knees and using special cleaning material for the entrance from the Main Crosstown entrance. Major inspection taking place with a lot of white hats.


