ehambobam
New Member
Rink definitely dismantled - stopped by tonight.
Here are the boards
Rink definitely dismantled - stopped by tonight.
Rink definitely dismantled - stopped by tonight.
Sorry was first time and didn't know there were more steps after uploading and attaching the post.Which pix would those be? Nothing is showing for me.
CIBC Square’s transit lobby is open, with a connection into the Bay East Teamway, train platforms and bus terminal.
View attachment 733094View attachment 733095
Two roll up doors? Daytime volume bypass?
One here and one under the escalator?
My hunch is that once the lobby is opened into the teamway, the tunnel sidewalk can be closed to finalize those finishings, close the temporary doorways and wrap up this project.