Tonight, looks like the rink is being disassembled.

View attachment 732482
Rink definitely dismantled - stopped by tonight.
IMG_1344.jpeg


Here are the boards
IMG_1345.jpeg
 
Not sure how reliable but security guard says the park is supposed to be open on May 11th. I sort of find that hard to believe but most of the hard surfaces are done, landscaping and a big cleanup are outstanding.

IMG_3342.jpeg
IMG_3340.jpeg
 
Two roll up doors? Daytime volume bypass?
One here and one under the escalator?

I agree that this will be a pass through, but it could still end up being a store that you can walk through. Otherwise, why have doors?

My prediction a few weeks ago turned out to be spot on:

My hunch is that once the lobby is opened into the teamway, the tunnel sidewalk can be closed to finalize those finishings, close the temporary doorways and wrap up this project.

With the teamway side entrances boarded off, all the heavy work has moved into the tunnel. They're disassembling the ramp and finishing the exterior of the windows.

For whatever reason the escalators are still blocked off. Maybe they don't yet want to drive traffic upstairs? There's still some light work going on on the second floor.

That said, people were naturally flowing in through walking down Bay Street. Will be much easier to point to the bus terminal. I'm looking forward to the GO signage.
 
Ok, maybe they’re serious about opening this park on May 11. There’s a lot of activity up here today.

IMG_3379.jpeg
IMG_3380.jpeg
IMG_3376.jpeg

IMG_3381.jpeg

The scope of the work appears to be laying paths and prep for landscaping.
 