I don’t follow this project too closely, how long do any of you estimate the completion of the elevated park? Is this summer/fall unrealistic?
 
I don’t follow this project too closely, how long do any of you estimate the completion of the elevated park? Is this summer/fall unrealistic?
Right now, the northern section of the park that was previously open to the public is closed as they just installed another tree sculpture. I would estimate that based on construction progress on the north tower, the overpass park should be open by late fall.
 
From earlier today:

IMG_2840.jpeg
 
Right now, the northern section of the park that was previously open to the public is closed as they just installed another tree sculpture. I would estimate that based on construction progress on the north tower, the overpass park should be open by late fall.
Great to hear! Thanks!
 
Double-time Sunday
Horizontal slab going down. Vertical slab going up to the lower roof for prep work. Ground crew prepping for trucking.
IMG_8154.jpeg


IMG_8155.jpeg


Bridge update. Some of the backside top glass was installed before the snow fall.
Mechanical level exterior insulation almost done. Cladding can’t be too far behind.
IMG_8156.jpeg



Saturday
Hard to see what’s changed up top. The top underside roof was not fireproofed but the yellow panels are coming down I assume so the glazing can continue on pace. Maybe temporary hoarding will be installed on the top level.
IMG_8145.jpeg


SE top corner
IMG_8160.jpeg


IMG_8141.jpeg


Front St dangerous icicles and dangerous deicing in progress.
IMG_8136.jpeg


IMG_8135.jpeg
 
Double-time Sunday
Horizontal slab going down. Vertical slab going up to the lower roof for prep work. Ground crew prepping for trucking.
View attachment 632577

View attachment 632578

Bridge update. Some of the backside top glass was installed before the snow fall.
Mechanical level exterior insulation almost done. Cladding can’t be too far behind.
View attachment 632579


Saturday
Hard to see what’s changed up top. The top underside roof was not fireproofed but the yellow panels are coming down I assume so the glazing can continue on pace. Maybe temporary hoarding will be installed on the top level.
View attachment 632580

SE top corner
View attachment 632586

View attachment 632581

Front St dangerous icicles and dangerous deicing in progress.
View attachment 632582

View attachment 632584
This photo gives me manhattan vibes for some reason lol
 