20250703_190438.jpg
 
The 400 King West building does not appear to be topped off yet - rebar nests and formwork in place for at least one more floor. Photos taken early this afternoon.

20250710_130110.jpg


20250710_130039.jpg


20250710_130015.jpg
 

Attachments

  • 20250710_130018.jpg
    20250710_130018.jpg
    411.1 KB · Views: 26
  • 20250710_104302.jpg
    20250710_104302.jpg
    309 KB · Views: 26
  • 20250710_115646.jpg
    20250710_115646.jpg
    274.9 KB · Views: 29
What is the plan for the concrete wall with no cladding highlighted in the red box below?

Photo Credit: AHK

king.jpg
 
What is the plan for the concrete wall with no cladding highlighted in the red box below?

Photo Credit: AHK

View attachment 667673
I would expect that it remains bare concrete until the adjacent property redevelops and builds its podium to match the bare wall height before stepping back. With glazing coming straight to the property line for 400 King West above the bare concrete level, I would imagine that a limiting distance agreement was reached with the adjacent project to require the adjacent property to provide minimum separation distance on its site.
 

Back
Top