C cdosrun New Member Member Bio Joined Feb 19, 2011 Messages 9 Reaction score 6 Saturday at 5:03 PM #2,041 This week driving by, looks like more than 2/3 of the concrete guardrails are poured and they were in the process of framing the last bit for the pour. The conrete for the road has all been poured.
This week driving by, looks like more than 2/3 of the concrete guardrails are poured and they were in the process of framing the last bit for the pour. The conrete for the road has all been poured.