drum118
Superstar
Sept 2
Lot more up on my site
Access To the QEW eastbound road is now close and will not reopen with the new ramps until 2026. All of the asphalt for the close westbound lanes have been removed with some new paving east of Dixie. Eastbound lanes for the 4th lane and off ramp is done except the final top coat from Haig Rd to Dixie as well most of the barrier wall. Still got to install the drainage system. New sound barrier wall still being installed A few sidewalk curbs need to rebuilt as they are fall apart already considering they are not in use at this time
Lot more up on my site
Access To the QEW eastbound road is now close and will not reopen with the new ramps until 2026. All of the asphalt for the close westbound lanes have been removed with some new paving east of Dixie. Eastbound lanes for the 4th lane and off ramp is done except the final top coat from Haig Rd to Dixie as well most of the barrier wall. Still got to install the drainage system. New sound barrier wall still being installed A few sidewalk curbs need to rebuilt as they are fall apart already considering they are not in use at this time