crs1026
Superstar
As it happens the last open house on the relocation of that Hydro line was in 2024..
Hydro One back then said it’s a 2027 project. Haven’t seen anything that confirms it, so the schedule may have slipped
It may be physically possible to lay the second track before the pylons come down, but the line certainly won’t be electrified until after the line is relocated. Hydro One's tcd for the replacement tunnel as of 2024 was 2031.
- Paul
Hydro One back then said it’s a 2027 project. Haven’t seen anything that confirms it, so the schedule may have slipped
It may be physically possible to lay the second track before the pylons come down, but the line certainly won’t be electrified until after the line is relocated. Hydro One's tcd for the replacement tunnel as of 2024 was 2031.
Hydro One
Hydro One is Canada’s largest electricity transmission and distribution service provider. We transmit and distribute electricity across Ontario, home to 38 per cent of Canada’s population
www.hydroone.com
- Paul
Last edited: