News   GLOBAL  |  Apr 02, 2020
 10K     0 
News   GLOBAL  |  Apr 01, 2020
 42K     0 
News   GLOBAL  |  Apr 01, 2020
 6K     0 

Is there a plan in place of what this will revert to when VLW is finished? It would be a wasted oppprtunity to have it return to a 4 lane road with parking on both sides…
The construction notice said that they'll be there until the end of 2027, when the 102 Ave lane reopens.
 
It’s a pipe dream but I would love to see an extension/continuation of the linear park that currently exists between 109 &110st. Dream scenario would be having current parks (beaver hills, warehouse, Ezio Faraone) linked together by linear parks. Even if we could design some of these streets to make for a transition to this in the future, would be incredible
 
We definitely need to make our downtown streets look and feel urban and walkable and 103Ave is not it at present.
102 and 103 Ave are legacies from the 70s (60s?) when they were converted to one-way streets to facilitate the rapid movement of vehicles in and out of downtown. It killed any street life that existed there and we're still living with that legacy.
 
They are installing concrete curbs and jersey barriers.

IMG_5872.jpeg
 
From Paths for People's Instagram today.

I might have to head down and take a look over the next few days....


View attachment 689423
they paved both of the approach paths last night and left the bridge 'open' this morning without barricades but later this afternoon it looks like the barricades are back so not sure that the bridge is officially open. in any case the deck looks done but still has some tools and garbage sitting on it.
 

Back
Top