Construction is progressing well. I’d say the thing I’m most worried about is the system integration with the SE line.
Have they finalized if TransEd is going to be contracted to be the operator of the SE line also?
 
Taken April 12, 2024
1000012922.jpg
1000012925.jpg
 
The contract states that the OMF should be done by the end of 2025. I wonder if it’ll be done by then
Well it appears that the core structure is built and they are now enclosing the building. I did see a number of crew working when I took the pictures. But I guess only time will tell. So far though Marigold has appeared to be keeping on schedule.
 