Foolworm
Active Member
This is gonna sound like wishful thinking, but do you guys think that frequencies would increase in this line generally once VLW opens? Looking at their weekend frequencies, part of me thinks that's woefully inadequate when WEM gets connected to the network.
Probably not, unfortunately. Unless there's an overhaul of the signalling system or additional grade separation at pinch points (and there are a lot of them), five minutes for each line is the max (2.5 for the downtown tunnel).
If you look at the mass transit study the City has plans for the BRT network to relieve some of that pressure, especially the Whyte-87 Ave route. WEM will be the hub for that network as well.