citylights
New Member
They're aiming for 2026.anyone knows the possible occupancy time based on the current construction status?
source (see pg 4): https://www.toronto.ca/legdocs/mmis/2024/te/bgrd/backgroundfile-242039.pdf
They're aiming for 2026.anyone knows the possible occupancy time based on the current construction status?
An increase to 45 storeys:
![]()
Application Details
www.toronto.ca
20-26 MAITLAND ST
To alter the development standards for the 40-storey mixed-use building (approved under Site Plan Control Application 19 240163 STE 13 SA) by increasing the number of dwelling units, the maximum permitted residential and overall gross floor area, that maximum permitted building height, and the maximum projection height of an elevator overrun. Also, to reduce the required number of residential dwelling units with 3 or more bedrooms, the minimum required amenity space, and the number of residentail visitor parking spaces. The new 45-storey mixed-use building (excluding mechanical penthouse) will have a total of 572 residential dwelling units and 7 residential visitor parking spaces.