These are various shots from the last few month, funnily enough the first few shots were taken the same day as KhalilHeron went by, the test section of brick was completed on the University Ave side at that point. The second group of shots has them setting up for the brick along the LRT tracks along with the completed granular pad to allow for construction works for the pedestrian bridge. The mechanical enclosure on the roof was also framed in the second set of shots.